A complete renovation of the room inventory in the cottages and the hotel.
Textile decoration for the restaurant, lobby, and summer terrace.

An interesting and unconventional project. In the lobbies, the height of the sheer curtains exceeds 6 m; in the bedrooms, there are glass partitions and double-sided curtains; in the kitchen area, Roman blinds were used.

The curtain fabric is produced in Belgium, which is why the manufacturing lead time was longer than usual.
Number of windows: 85. Project completion time: 5 weeks.